{"id":14838,"date":"2024-09-25T11:08:53","date_gmt":"2024-09-25T16:08:53","guid":{"rendered":"https:\/\/www.ise.ufl.edu\/oemp\/?page_id=14838"},"modified":"2025-04-16T09:15:41","modified_gmt":"2025-04-16T14:15:41","slug":"23proj","status":"publish","type":"page","link":"https:\/\/ise.ufl.edu\/oemp\/proj\/23proj\/","title":{"rendered":"Master&#8217;s Projects:  Class of 2023"},"content":{"rendered":"<table width=\"705\">\n<tbody>\n<tr>\n<td width=\"530\"><strong>Project Title<\/strong><\/td>\n<td width=\"175\"><strong>Mentor<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Advanced Material Procurement Strategy for Future Aerospace Programs<\/td>\n<td>Semenov<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Evaluating Pepsi&#8217;s Raw Material Inventory Level and Loss<\/td>\n<td>Hu<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Itinerary Planning through Optimized Network Algorithms and Statistical Analysis<\/td>\n<td>Kazachkov<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Modeling for Technical Execution<\/td>\n<td>Alvarado<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Optimization of Investment and Maintenance Activities in Power Transformers<\/td>\n<td>Guan<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Optimizing Inventory Levels at CED Orlando<\/td>\n<td>Motamedi<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Optimizing the Onboarding Process<\/td>\n<td>Giang<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Solutions to Aircraft Removals in the Greenville Depot<\/td>\n<td>Yang<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">&#8220;So, you want to run a Hedge Fund?&#8221;<\/td>\n<td>Amini<\/td>\n<\/tr>\n<tr>\n<td width=\"530\">Statistical Model to Enable Future Soldier Training Solutions<\/td>\n<td>Reisi<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Project Title Mentor Advanced Material Procurement Strategy for Future Aerospace Programs Semenov Evaluating Pepsi&#8217;s Raw Material Inventory Level and Loss Hu Itinerary Planning through Optimized Network Algorithms and Statistical Analysis Kazachkov Modeling for Technical Execution Alvarado Optimization of Investment and Maintenance Activities in Power Transformers Guan Optimizing Inventory Levels at CED Orlando Motamedi Optimizing the [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"parent":4266,"menu_order":23,"comment_status":"closed","ping_status":"closed","template":"page-templates\/page-sidebar-none.php","meta":{"_acf_changed":false,"inline_featured_image":false,"featured_post":"","footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-14838","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/14838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/comments?post=14838"}],"version-history":[{"count":1,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/14838\/revisions"}],"predecessor-version":[{"id":15055,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/14838\/revisions\/15055"}],"up":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4266"}],"wp:attachment":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/media?parent=14838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}