| Project Title | Mentor |
| A Critical Look at the Integrated Product Team Structure and the Modification Process: A Business Process Improvement Effort | Tufekci |
| A Proposal to Improve the Process of Staff Allocation at Architecture/Engineering Firms | Geunes |
| Advanced Customer Marketing Innovations: Product Locator System | Elzinga |
| Carnot: A Methodology for Mining Profits from Any Process | Bai |
| Chartered Semiconductors: Knowledge Management for Technology Transfer | |
| Computer Software Development: Process Reengineering for PK Group in Vergys, Inc.-From the Waterfall Process to a Component-Based Development Process |
Bai |
| Creating a Labor Scheduling Tool for Distribution Centers | Geunes |
| Energy Reduction Analysis | Patterson |
| Green Power: Applications and Analyses of Wind Power as an Alternative Energy Resource | Elzinga |
| Improving a Hazardous Materials Tracking System at a Small Commercial Aircraft Rework Facility | Elzinga |
| Improving the 500-Hour Periodic Inspection of the HH-60 Pavehawk | Geunes |
| Information Integration in the Analytical Laboratory for Effective Knowledge Transfer to Enable and Optimize Scientific Research and Development | Shen |
| IT Improvements at H.W. Lochner, Inc. | Elzinga |
| Lean/Flow Manufacturing at ClosetMaid | Tufekci |
| PDM & Paravant: The Struggle to Keep It All and Join the Big Leagues | Tufekci |
| Performance Simulation of a 2nd Tier Relay Network in a Cellular System | Bai |
| Process Improvement for New Service Connection | Geunes |
| Process Improvement: Software Verification and Validation | Bai |
| Product Feature-Based Scheduling and Costing: Developing Customizable Routings through Constraint Programming in Baan IV | Geunes |
| Productivity Improvement Plan for Tampa Land Development Engineering Unit | Elzinga |
| Redesign and Optimization of the Submarine Officer Training Pipeline | Geunes |
| Redesign/Implementation of Web Based Knowledge Base/Newsgroup | Bai |
| Reengineering of a Maintenance Program | Tufekci |
| Reengineering of a Semiconductor: Maintenance Organization | Tufekci |
| Reengineering the Lessons Learned Process Used by the Airframe Division of Argo-Tech Costa Mesa | Tufekci |
| Supply Chain Management at Honeywell International | Shen |
| The Integrated Installation and Configuration Management System | Geunes |