| Project Title | Mentor |
| Assigning Sand Pits Using Mixed Integer Programming | Geunes |
| CMMI for SE/SW with Agile Processes | Romeijn |
| COTS in a Traditional Non-COTS Environment – A Supply Chain Management Perspective | Geunes |
| ERP Implementation And BPR | Tufekci |
| FBI Encoding Automation Kaizen and Post-Event Analysis | Schaub |
| Feasibility of Using Bundled Inventory for Long Term Projects | Akcali |
| Global Positioning System (GPS) Percipitable Water in Forecasting Lightning at Spaceport Canaveral | Romeijn |
| Improved Reliability through Efficient Use of Data and Resources | Romeijn |
| Increasing Performance through the Implementation of Lean Strategies | Tufekci |
| Is CMMI and EVMS the Answer to Software Project Failure? | Schaub |
| Nanobit Improvement Project | Schaub |
| New Manufacturing Equipment Acquisition and Implementation Process | Tufekci |
| Optimizing the Mix of Transmission Planning Projects for Electric Utilities | Romeijn |
| Probabilistic and Deterministic Analysis of Gas Turbine Vane Metal Thickness and TBC Coating Thickness | Romeijn |
| Process Improvement: Boeing Delta IV Maintenance Program | Tufekci |
| Procurement Management in the Defense Contracting Industry: Engineer-to-Order vs. Build-to-Print | Geunes |
| Re-Engineering Performance Management | Schaub |
| Statistical Process Control for the Capability Maturity Model Integration | Romeijn |
| Strike Price Optimization | Geunes/AitSahlia |
| Taking Process Management to the Next Level | Schaub |
| United Space Alliance Nonconformance Information System | Akcali |