| Project Title | Mentor |
| Applied Process Improvements in Furniture Inventory Management | Geunes |
| Business Plan for A Contactless Mobile Payment Application | Stanfill |
| CMMI Level X to Level Y: Degree of Quality Improvement | Schaub |
| Corrosion Rate Study for Life Cycle Assessment of Aerospace Hardware | Schaub |
| Design Standardization of Large Precision Space Structures – A Feasibility Study | AitSahlia |
| Dynamic Price Engine | Richard |
| Feasibility Analysis of Mass Transit Upgrades at KSC | Schaub |
| Helium Scheduler Measurement and Optimization | Sapra |
| Improving Small Caliber Production Efficiency | AitSahlia |
| Laser Line Convergence Vehicle Alignment System | Sapra |
| Lean Event Pearl Harbor | Hartman |
| Lockheed Martin Development Inspection Methods Plan For Receiving Inspection | Hartman |
| Marketing A System to Raise And Lower A Sailboat Mast | Schaub |
| Measuring the Costs of Custom Products Through Better Technology Utilization | Middelkoop |
| Modeling and Analysis of Global Economic Centers of Gravity | Smith |
| NASA Constellation Supply Chain Modeling And Optimization | Sapra |
| Shuttle Integrated Operations Optimization | Smith |
| Start-up for A Small Business | Geunes |
| Systems Engineering Cost Model | Hartman |
| Total Asset Utilization | Schaub |